Scottsdale Pool + Court Design-Build
One plan for the whole backyard. We design and build your pool, landscape and court.
Quick answer: If you are comparing pool builders in Scottsdale and a pickleball court, half court or mini game court is also on your wish list, put all of it on one plan before anything is dug. We design and build your pool, landscape and court. The pool, deck, planting and court are drawn together, so the pool equipment, the barrier fence and the court fence each get a sensible spot, and the concrete court slab is not squeezed into whatever space is left.
Scottsdale has clear rules on pool setbacks, barriers, easements and equipment placement. They shape where a court can go as much as where the pool goes. Call or text (480) 493-0031 to check your yard and book your build.
Most pool proposals show the pool, the deck and the equipment. If you also want a court, these are the questions that decide whether it will fit well later:

Photo: a Dink Pro Courts court build in progress.
According to the City of Scottsdale, a pool permit covers the pool itself plus the related electrical and plumbing work. The submittal includes a construction plan showing how the pool will be built and a site plan showing its location and the required setbacks. The site plan has to show:
Two details matter for timing. Pool plan approval waits until the accompanying fence and wall plan is approved, and a gas heater needs its own plumbing permit for the gas line. The City also lets builders register a Standard Pool Plan, which can cut fees and review time on later permits. On a lot in the ESL overlay where NAOS has not been dedicated yet, the City notes that a dedication may be needed before a permit is issued.
Because the court fence, any retaining wall and the pool barrier all appear on the same set of plans, it makes sense to draw the court at the same time. Scottsdale requires a permit for any fence taller than 3 feet and engineered plans for every retaining wall, so a court on a sloped lot can add review time if it is planned late.
Scottsdale’s standard pool setback is 2 feet from the property line. That changes when the lot has an easement, such as a public utility easement, a drainage easement or NAOS. In that case the pool, the pool deck and the pool equipment all have to stay out of the easement.
Pool equipment has its own rule: it cannot be closer than 10 feet to any opening into an indoor living area on the adjacent property. Pumps, filters and heaters make noise, and the same spot that bothers a neighbor would sit right beside a court bench. We look for a pad location that works for the City, the neighbors and the players.
| Item on the plan | What Scottsdale says | What it means for the court |
|---|---|---|
| Pool and deck | 2 ft from the property line, unless an easement applies | Measure the court pad from the deck edge, not the lot line |
| Easements | Pool, deck and equipment cannot disturb them | The court slab and fence stay out of the easement too |
| Equipment pad | At least 10 ft from openings to a neighbor’s living area | Keep it away from the court gate and seating |
| Pool fence | Location and height shown on the pool plan | Draw the court fence on the same plan |
| Retaining walls | Engineered plans required for all of them | Grade the court pad early to see if a wall is needed |
Scottsdale’s current pool barrier requirements apply to single-family pools, spas and hot tubs built after July 20, 1995. The City is direct about it: there are no exemptions for households without children, and every hot tub or spa needs an approved barrier whether or not the installation is inspected.
A court fence can work alongside the pool barrier, but the two should be planned as a pair. We keep court benches, ball storage and anything easy to climb clear of the barrier, make sure the court gate does not open into the pool enclosure, and show both fences on the drawings the City reviews.

Photo: a Dink Pro Courts court build in progress.
Scottsdale lots range from compact yards in established neighborhoods to large desert lots in the north. The layout questions are the same; the answers change with the lot.
For a full pickleball court, USA Pickleball calls for at least 30 by 60 feet of total playing surface, and 34 by 64 feet for new construction. If those numbers do not fit once the pool is drawn, the Mini Court Game Center is built for smaller footprints.
As a typical range, not a promise: we can usually be pouring concrete within a week, then the slab cures 21 to 28 days depending on weather before we paint. Heat matters too: the National Weather Service averages 111 days a year at or above 100 degrees in the Phoenix area, so summer pours start early in the day. Caliche, a hard cemented soil layer that the University of Arizona Cooperative Extension calls common in Valley yards, can affect digging for both the pool and the court footings.
Scottsdale gives clear guidance for backwashing or emptying a pool. Water can go onto your own landscaping if it tests between pH 6.5 and 8.5 with chlorine below 0.1 mg/l, drained over a few days so it soaks in and stays on the property. It can also go into the sewer clean-out on your own lot at a slow rate, under 12 gallons per minute. It must not go to the street, the alley, a storm drain, a wash or a neighbor’s lot.
That guidance shapes the yard design. We slope the court so it sheds water away from the pool deck and toward planting areas that can take it, and we keep the drain-down route from crossing the court surface.
The court has set starting prices. The pool and the landscape are priced for your lot after a site walk.
| Court option | Price | What is included |
|---|---|---|
| Full concrete pickleball court | $29,000* | Full-size concrete pickleball court with acrylic color coats, lines, a net and 4 paddles |
| Mini 1v1 Game Center | $16,999* | Compact slab with mini pickleball, a hoop, shuffleboard and badminton |
| Mini Doubles Game Center | $23,999* | A roomier mini layout for doubles play |
| Financing | $598/mo for 60 months, with excellent credit* | Monthly payments through lenders, with credit approval |
* Courts start at $29,000 for a full court, with a basic net and 4 paddles included. $598/mo for 60 months, with excellent credit. Access past a pool deck, grading, retaining walls, fencing and lighting can change the court quote. The pool and the landscape are quoted separately for your yard.
Estimated rates and terms are not binding and are subject to change. Your actual APR depends on credit score, amount financed and credit history; only borrowers with excellent credit qualify for the lowest rates. All financing is subject to credit review and approval by lending partners.
Want to see the court before you commit? Try colors in the court designer.
Tell us your Scottsdale neighborhood, the lot size if you know it, and what you want in the yard: pool, spa, court, shade or planting. We will be in touch to book a site walk. Prefer to talk? Call or text (480) 493-0031.
Request source: pool-builders-scottsdale
We design and build your pool, landscape and court as one backyard plan. You get one drawing and one schedule, so the pool, the planting and the court are placed together instead of one at a time.
The City asks for a construction plan for the pool and a site plan showing where it sits, with dimensioned setbacks to the property lines, easements and house, the access route, the staging area for materials, any NAOS or native plants, and the pool fence location and height. Pool plan approval waits until the fence and wall plan is approved.
The standard setback is 2 feet from the property line, unless an easement such as a public utility, drainage or NAOS easement affects the lot. Then the pool, the deck and the equipment all have to stay out of the easement.
Scottsdale says pool equipment cannot be closer than 10 feet to any opening into an indoor living area on the neighboring property. We place the equipment pad with that rule in mind and keep it away from the court gate and the seating area.
Yes. Scottsdale states there are no exemptions for households without children. The barrier rules apply to single-family pools, spas and hot tubs built after July 20, 1995, and every hot tub or spa needs an approved barrier.
Often. USA Pickleball calls for at least 30 by 60 feet of total surface for a court, and our standard court slab is a bit smaller. If the lot is tight once the pool and deck are drawn, a mini game center beside the pool is a common answer.
On most lots the pool is dug before the court is poured, because the pool excavation needs the widest access. The court slab goes in once the heavy equipment no longer needs that route.