Quick answer: In both Phoenix and Scottsdale, an uncovered backyard court slab that sits close to grade is usually not a building permit item by itself. The parts around the court are where permits come in: a fence taller than 3 feet, retaining walls, and new wiring for court lights. Scottsdale also asks for a courtesy review of patio slabs so the city can check setbacks and easements. Your HOA is a separate approval with its own rules. Requirements change and every lot is different, so the city has the final word for your address.
Our team has 20+ years experience.
Call or text (480) 493-0031 to check your yard and book your build.
| Court part | Phoenix | Scottsdale |
|---|---|---|
| Concrete court slab (no roof, near grade) | Listed as exempt from a building permit when not more than 30 in above grade | No permit; courtesy review for patio slabs not over 30 in above grade |
| Fence 3 ft or lower | No building permit | No permit; courtesy site plan review for walls |
| Fence over 3 ft | Building permit; zoning and site drainage review up to 6 ft, full code review above 6 ft | Building permit |
| Retaining wall | Permit if over 3 ft (top of footing to top of wall) or supporting a surcharge | Engineered plans for all retaining walls |
| Court lights (new wiring) | Utilities need their own permit | Electrical permit required for new wiring |
| Shade structure or ramada | Exempt only if small, detached and with no utilities | Building permit |
This table summarizes the city sources linked below as of November 2026. It is a planning guide, not a legal opinion. We confirm the current rules for your address before work starts.
The Phoenix Building Construction Code lists work that is exempt from a permit. Item 7 covers platforms, sidewalks and driveways not more than 30 inches above grade, and the city’s commentary adds that decks, sport courts and similar uses with no roof covering are included in that exception. Source: City of Phoenix, Work Exempt from Permit (PBCC 105.2).
That exemption is about the slab only. The same document notes that exempt work still has to meet code, and that utilities run to an exempt structure need their own permit. For a court, that means lighting circuits and any power for a ball machine or speakers are permitted work even when the slab is not.
Ball containment is where Phoenix rules matter most. The city’s residential fences and walls handout says a building permit is needed for fences and retaining walls over 3 feet, and that zoning limits fence height to 3 feet in the required front yard and 6 feet in side and back yards. A variance from the Planning Department is needed to go higher. Source: City of Phoenix, Residential Fences and Walls.
Many families want 8 to 10 feet of fencing behind each baseline. On a Phoenix lot, we talk through that early, often with lower side fencing, landscape screening or court placement that keeps balls in without a tall perimeter. Our pickleball court fencing guide covers the options. Hillside lots are reviewed site by site, so expect extra steps there.

Scottsdale’s home improvement guidance lists patio slabs and sidewalks not over 30 inches above grade as work that needs no permit but does need a courtesy review, so Planning & Development Services can confirm the work meets code and is not in a setback or easement. The same page lists low-voltage landscape accent lighting as courtesy review only, while walls and fences are on the building permit list. Source: City of Scottsdale, Home Improvement.
For fences, Scottsdale requires a permit for any fence taller than 3 feet, for adding height to an existing fence, and for replacing an existing fence. All retaining walls need engineered plans. Walls 3 feet or lower still need a courtesy site plan review for zoning and stormwater. Source: City of Scottsdale, Walls and Fences. Electrical work for court lights needs an electrical permit; many single family electrical permits are “minimum” permits without plan review. Source: City of Scottsdale, Permit Services.
Two more Scottsdale notes from the same page: removing or relocating native plants needs a permit, and exterior painting in Environmentally Sensitive Lands (ESL) and historic districts goes through courtesy review. Many north Scottsdale lots are in ESL areas, so we check court colors and any native plants in the way from the first site visit.
City approval and HOA approval are two different things, and one does not stand in for the other. Scottsdale’s own guidance reminds owners that subdivision CC&Rs may govern items the city does not regulate. Most Valley HOAs review courts, fence height, lights and colors through an architectural committee. If you are planning courts for a whole community, our HOA pickleball court planning guide covers board approvals, neighbors and a board-ready packet checklist.
For trade partners and general contractors who need the responsibility split in writing, see who handles permits and HOA submittals.
Arizona law requires a utility locate before excavation. Lines for irrigation, pool equipment, gas and electric often run right where a court wants to go. We request the locate through Arizona 811 and plan the slab around what is marked.
The construction steps after approval are covered in pickleball court construction, and the installation process and pricing are in pickleball court installation. Building in Scottsdale? See our Scottsdale court builder page. In Phoenix, see pickleball court installation in Phoenix.
Permits and HOA steps do not change what the court itself includes. For a sense of scale, here is our pickleball court pricing:
Courts start at $29,000 for a 54 ft x 28 ft court, with a basic net and 4 paddles included. Financing is $598/mo for 60 months with excellent credit. See financing options.
Estimated rates and terms are not binding and are subject to change. Your actual APR depends on credit score, amount financed and credit history; only borrowers with excellent credit qualify for the lowest rates. All financing is subject to credit review and approval by lending partners.
The Phoenix Building Construction Code lists uncovered sport courts not more than 30 inches above grade under work exempt from a building permit. Fences over 3 feet, retaining walls over 3 feet and new wiring for lights still need permits.
Scottsdale lists patio slabs not over 30 inches above grade as needing no permit but a courtesy review. Fences over 3 feet, all retaining walls and electrical work for lights need permits or engineered plans.
The city handout limits fences to 6 feet in side and back yards under zoning, and a building permit is needed above 3 feet. Going taller needs a variance, so we plan fence height early.
Most Valley HOAs review courts, fences, lights and colors. HOA approval is separate from the city. We prepare the drawings and details, and you submit them to the association.
We confirm what your address needs and prepare the court drawings. Who files each permit or HOA application is written into your scope before work starts.
We schedule the build after the approvals you need are in hand, so the court does not have to change after the fact.
Send a few photos of the backyard, your address and your HOA name, and we will map out what your court needs before anything is built.
Call or text (480) 493-0031 to check your yard and book your build.