Quick Connect
Phoenix Pool + Court Planning
One contact for the whole backyard: we design and build your pool, landscape and court.
Quick answer: If you are comparing pool builders in Phoenix and you also want a pickleball, basketball or game court, plan both before the pool design is locked. Dink Pro Courts is your one contact for the whole backyard: we help you plan where the pool, court and planting areas go as one layout, and we build the court on a concrete slab. We design and build your pool, landscape and court.
Court prices and financing are in the cost table below.
A pool usually claims the most valuable part of a Phoenix yard: the flattest ground, the spot closest to the patio, and the access path that construction equipment needs. Once the pool shell, deck and equipment pad are placed, the leftover space decides whether a court fits at all.
Three things tend to go wrong when the court is an afterthought:
A short layout session at the start avoids all three. It gives the pool design a clear picture of where the court is going.

Dink Pro Courts build in progress.
We measure the yard, note the sun path, slope and drainage, and mark the court plus its run-off area. The pool design then leaves the court zone clear.
One team plans and builds the whole backyard, so nothing falls between trades. The pool dig, plumbing, deck and fill dates and the court pad, pour and surfacing are planned on one schedule, so nobody is waiting or undoing finished work.
Grading the pad, forming, vapor barrier and post-tension cables, the concrete pour and curing, then acrylic surfacing, lines, net and any fence or lighting you choose. One crew owns the court from layout to the last line.
You approve the layout, the finishes and the schedule. We keep you updated on what is happening in the yard at each stage.
Every Phoenix pool needs a barrier. The City of Phoenix pool barrier guide calls for a fence at least 5 feet high, gates that self-close, self-latch and swing outward from the pool, and latches at least 54 inches above the ground. Phoenix inspects new pools before gunite and again before plaster, and once a barrier is approved it has to stay in place for the life of the pool.
That matters for a court. A court fence and its gates sit close to the pool barrier in many yards, and a new opening in the wrong place can create a gap. The pool team owns the barrier design; we place the court, its fence and its gates so the barrier stays continuous, and we share the court layout before the pool plans go to the city.
If you also own a home in Scottsdale, or you are a pool builder working there, see how Scottsdale pool builders refer backyard court projects to us. For Phoenix pool permits themselves, the city keeps a residential pool and spa permit page, and the pool team pulls that permit.
| Court option | Price | What is included |
|---|---|---|
| Full concrete pickleball court | $29,000* | Full-size concrete pickleball court, surfaced and striped, net and 4 paddles included |
| Mini 1v1 Game Center | $16,999* | Small-footprint game slab: mini pickleball, hoop, shuffleboard and badminton |
| Mini Doubles Game Center | $23,999* | Roomier mini court with all four games |
| Financing | $598/mo for 60 months, with excellent credit* | Monthly payments through outside lenders, credit approval required |
* Courts start at $29,000 for a 54 ft x 28 ft court, with a basic net and 4 paddles included. Financing is $598/mo for 60 months with excellent credit. We confirm the court price after a site walk. Pumping concrete past a finished pool deck, extra fencing or lights can add to it. The pool is quoted separately from the court.
Estimated rates and terms are not binding and are subject to change. Your actual APR depends on credit score, amount financed and credit history; only borrowers with excellent credit qualify for the lowest rates. All financing is subject to credit review and approval by lending partners.
On wide, flat lots the pool takes one side and the court takes the other, with shade or a ramada between them so people can watch both. This is usually the simplest plan to build and to schedule.
On deeper lots the pool stays close to the patio and the court sits farther out. Plan a hard path between them and keep the court fence and the pool barrier separate.
When a full court will not fit beside the pool, a mini game center can. It puts pickleball, a portable hoop, shuffleboard and badminton on one smaller slab. See the Mini Court Game Center or check your yard for a mini court.
Families who want basketball and pickleball often share one slab: pickleball lines and a hoop footing on the same court. Read more about basketball court construction.

Dink Pro Courts build in progress.
Summer heat and monsoon storms matter for both projects. Storm water needs a clear route away from the pool deck and the court. Caliche can slow digging for both. Shade helps players and swimmers alike, but tree roots and leaf drop should stay away from the court surface and the pool.
Most HOAs in the Valley review pool and court plans separately. For the court, Dink prepares the drawings and specs (site plan, court colors, fence height and type, and the lighting layout), and the homeowner files the HOA application. The pool team handles the pool paperwork.
For court-specific detail, see pickleball court construction, pickleball court construction cost and pickleball court installation in Phoenix. Planning landscaping too? See planning landscaping and a court in Phoenix.
Share the answers with us and we will fit the pool and court plan to them.
Yes. In Phoenix the pool is laid out with the court from day one, so the deck, the barrier and the court fence fit together instead of competing for space.
The City of Phoenix pool barrier guide calls for a barrier at least 5 feet high with self-closing, self-latching gates that swing outward from the pool and latches at least 54 inches above the ground. The pool team designs that barrier. We place the court and its fence so the barrier stays continuous and no court gate opens a gap into the pool area.
They should not, if the dates are shared. Phoenix inspects new pools before gunite and before plaster. We keep our crew and materials out of the pool area around those inspections and plan the court pour on separate days.
Usually the pool excavation, because it moves the most soil and needs the widest access. The court pad follows once heavy equipment no longer needs the space, and the pool team pours its deck around the finished court edge or the other way around, depending on the layout.
Sometimes not. If the deck blocks the route, we pump the concrete over it. We check this on the opening site walk so the plan does not depend on a path that disappears later.
Orientation and fencing. We avoid pointing a baseline at the pool, add fence height where play faces the water and leave a walkway between the court and the deck.
That is a call for the electrician on your project. What we do is mark where court light poles and conduit will go, so the pool and landscape teams can plan their own trenches around them.
Let us know where the pool project stands (comparing builders, in design, or already built) and roughly how much open space is left. We will follow up about a court layout. Prefer to talk? Call or text (480) 493-0031.
Tell us where you are in the pool process: still comparing pool builders, design underway, or pool already in. Send a few yard photos and we will mark a court area and show how the work can be lined up.
Call or text (480) 493-0031 to check your yard and book your build.