Phoenix Pavers

Pavers in Phoenix, Planned With Your Landscape and Court

We design and build your pavers, landscape and court as one backyard plan, so patios, paths and the playing surface all fit.

Quick answer: If you are looking for pavers in Phoenix, think about the whole backyard before you pick a stone. We design and build your pavers, landscape and court, which means the patio, the walkways, the pool deck and a concrete pickleball or basketball court are drawn together, graded together and built in the right order. Pavers go where people walk and gather; the court goes on its own poured concrete slab. Pouring a new pool deck? See how our pool builders in Phoenix plan the pool, pavers and court as one yard.

That single plan avoids the most common Phoenix backyard mistakes: a patio that drains onto the court, a path that ends at the wrong gate, or a paver field poured right where the court should have gone. Call or text (480) 493-0031.

Where Pavers Work Well in a Backyard With a Court

Pavers are made for areas with lots of foot traffic and furniture: you can lift and reset a section, and the pattern hides small changes over time. That makes them a natural fit for the spaces around a court:

What pavers should not be is the court itself. A pickleball ball needs a smooth, continuous surface to bounce true, so every court we build is a poured concrete slab finished with acrylic color coats and lines. The paver areas frame the court instead of replacing it.

Drone view of a backyard slab pour on a Dink Pro Courts build in progress

Photo: a Dink Pro Courts court build in progress.

Planning Pavers and a Court Together

Start with the court footprint

A court takes the most flat space, so we place it before anything else. The official pickleball court is 20 by 44 feet, and USA Pickleball recommends a total surface of at least 30 by 60 feet, with 34 by 64 feet suggested for new construction. Our standard backyard court is 54 ft x 28 ft. If your yard is tight, a mini court can still fit. Once the court is placed, the patio and paths fill in around it.

Set the grades so water leaves both surfaces

Phoenix gets long dry stretches and then sudden monsoon storms. The court slab is built with a slight slope so rain runs off, and the paver areas around it need their own fall away from the house and away from the court edge. Planning both surfaces at once lets us send water to the right place, such as gravel, a planting area or the street side, instead of trapping it between a patio and a court.

Plan the access route before anything is built

A concrete truck or pump has to reach the court site. If the paver patio goes in early along the main access path, it can be damaged or block the pour. We map the route for heavy equipment, then schedule the pavers that sit on that route after the court is poured.

Match colors and textures

Court colors are a big design choice. A paver color that works with the court surface and the house makes the whole yard look planned. See our guide to pickleball court colors for ideas, then we pick paver tones to match.

Phoenix Permits, Soil and Heat

Permits

The City of Phoenix lists flatwork such as platforms, walks and driveways that sit no more than 30 inches above grade, and not over a basement, as work exempt from a building permit. Courts with no roof are on the same exempt list. Other backyard items still need permits: fences over 3 feet and retaining walls over 3 feet, for example. If your design adds a covered patio, a raised deck or a tall wall, we confirm the permit path before work starts.

Caliche

Many Phoenix yards have caliche, a hard, cemented soil layer that the University of Arizona Cooperative Extension describes as a common challenge for home yards. It can slow excavation and affect drainage. We look for it during the site walk so the base work for both the pavers and the court slab is planned around it.

Digging safely

Buried lines are marked before any digging. Arizona Blue Stake is called at least two days ahead, as city permit guides advise, and we keep heavy work clear of marked lines.

Heat

The National Weather Service averages 111 days a year at or above 100 degrees in Phoenix, and 21 days at or above 110. Crews start early in summer, and the concrete pour is timed for the cooler part of the day. As a typical range, not a promise: we can usually be pouring concrete within a week, then the slab cures 21 to 28 days depending on weather before we paint.

Backyard graded and formed for a slab before the pour, Dink Pro Courts build in progress

Photo: a Dink Pro Courts court build in progress.

A Typical Order of Work

  1. Site walk and layout. We measure the yard, check slope, soil and access, and mark the court and paver areas.
  2. Utility marking. Lines are located before digging.
  3. Grading and court slab. We grade, form, place the vapor barrier and post-tension cables, and pour the court.
  4. Curing. The slab cures before the acrylic surface goes on.
  5. Paver base and pavers. Paths, patio and court-side pads are built once heavy equipment is done.
  6. Court surface, lines and net. Color coats and striping go on after curing.
  7. Planting and finish work. Plants, rock and lighting finish the yard.

Every yard is different, so this is a starting order, not a fixed schedule. If you want the pavers now and the court later, we plan for that too.

What the Court Part Costs

The court has fixed starting prices; the paver work does not, because every patio and path is a different size.

Court optionPriceWhat is included
Full concrete pickleball court$29,000*Regulation 54 ft x 28 ft slab, color coated and striped, with a basic net and 4 paddles
Mini 1v1 Game Center$16,999*Small concrete pad with mini pickleball, a portable hoop, shuffleboard and badminton
Mini Doubles Game Center$23,999*Wider mini pad carrying the same four games
Financing$598/mo for 60 months, with excellent credit*Monthly payments through outside lenders once credit is approved

* Courts start at $29,000 for a 54 ft x 28 ft court, with a basic net and 4 paddles included. $598/mo for 60 months, with excellent credit. Paver areas, landscape and other backyard work are quoted per project after a site walk, because area, paver style, base work and access all change the number.

Estimated rates and terms are not binding and are subject to change. Your actual APR depends on credit score, amount financed and credit history; only borrowers with excellent credit qualify for the lowest rates. All financing is subject to credit review and approval by lending partners.

Paver Design Ideas for Phoenix Yards With a Court

For more landscape ideas around a court, read landscaping around a pickleball court in Arizona.

The Court Inside Your Paver Plan

Pavers frame the yard; the court is the centerpiece, and it is the part we are known for. Our team has 20+ years experience.

Planning a court in Phoenix? See pickleball court installation in Phoenix.

Tell Us About Your Backyard

Tell us about your yard: rough size, whether you want a patio, paths or a pool deck, and what kind of court you are thinking about. We will call you to book a time to see the yard. Prefer to talk? Call or text (480) 493-0031.

Request source: pavers-phoenix







PhoneTextEmail


Pavers in Phoenix: Common Questions

No. Our courts are always poured concrete slabs with an acrylic playing surface. Pavers are a good choice for the patio, the paths and the deck around the court, where small gaps between stones do not matter, but a court needs one smooth, continuous surface for true ball bounce.

Phoenix lists flatwork such as platforms, walks and driveways that sit no more than 30 inches above grade, and not over a basement, as work exempt from a building permit. A covered patio, a fence over 3 feet or a retaining wall over 3 feet does need a permit. We check your plan against the city list before work starts.

Yes, as long as the paver field sits slightly below the court edge and slopes away from it, so storm water runs off the court and is not trapped against it. We set those grades in the plan before either surface goes in.

Caliche is a hard, cemented soil layer that is common in Phoenix yards. It can slow digging and affect drainage, so we check the soil during the site walk and plan the base and any drainage around what we find.

Paver pricing depends on the area, the paver style, the base work and access to the yard, so we price it per project after a site walk. Court prices are fixed starting points, listed in the cost table on this page.

Yes. Many families pour the court in phase one and add the paver patio and paths later. If you phase the work, we still draw the full plan up front so the court, the drainage and the future paver areas fit together.

Work goes on all year. In the hottest months crews start early in the day; the National Weather Service averages 111 days a year at or above 100 degrees in Phoenix, so we plan around the heat for both the paver crew and the concrete pour.

Phoenix Backyards

Plan Your Pavers and Court Together

One plan for the patio, paths, landscape and a concrete court. Call or text (480) 493-0031.