Quick Connect
Mesa Pool + Court Planning
One contact for the backyard: we design and build your pool, landscape and court.
Quick answer: If you are getting quotes from swimming pool builders in Mesa and a pickleball or basketball court is on the wish list, decide where the court goes before the pool design is final. Dink Pro Courts is your one contact for the whole backyard: we plan the court around the pool and landscape, and we build the court on its own concrete slab. We design and build your pool, landscape and court.
See the table below for court prices and financing.
A pool design locks in a lot of the yard: the deck, the equipment pad, the barrier fence and the path the excavator takes. If a court comes up after the pool contract is signed, it has to squeeze into whatever is left. If it comes up during pool design, the pool team can shift the pool a few feet, the deck can stop at the right line and the barrier can be drawn with the court fence in mind.

Dink Pro Courts build in progress.
Mesa adopted the 2024 International Swimming Pool and Spa Code with local amendments. Under it, every barrier around a pool or spa has to be installed, inspected and approved before plastering or filling, and in-ground pool sites need construction fencing while they are being built. A spa or hot tub holding more than 18 inches of water counts as a residential pool too.
Those rules belong to the pool team. Our job is to keep the court from getting in their way: no court gate opening into the pool area, no court fence that leaves the barrier incomplete and no pour scheduled on a day the barrier is down. Electrical work for lights also needs a Mesa construction permit, so court lighting is planned alongside the pool electrical.
Some Mesa yards also take flood irrigation, and SRP is clear that the homeowner must keep that water on the property. With a pool and a court in the same yard, the flood basin has to sit away from both. For anything not covered here, check with your HOA and the city permit office.
| Item | Responsible |
|---|---|
| Combined layout of pool, deck, court and landscape | Drawn with you as one plan; Dink lays out the court |
| Court slab, surface, lines, net, fence and court lighting | Dink Pro Courts |
| Pool, deck, equipment and pool barrier | Dink Pro Courts: pool design and build |
| Planting, irrigation, rock and flood basins | Dink Pro Courts: landscape design and install |
| Schedule across teams | Dink sets court dates around the pool milestones |
| HOA court drawings | Dink prepares them; the homeowner files |
One team plans and builds the whole backyard, so nothing falls between trades. Nobody works from an outdated drawing.
| Court option | Price | What is included |
|---|---|---|
| Full concrete pickleball court | $29,000* | Full-size court on its own concrete slab, net and 4 paddles included |
| Mini 1v1 Game Center | $16,999* | Four-game mini slab that can sit beside a pool deck |
| Mini Doubles Game Center | $23,999* | Bigger mini court for doubles |
| Financing | $598/mo for 60 months, with excellent credit* | Monthly payment option through outside lenders |
* Courts start at $29,000 for a 54 ft x 28 ft court, with a basic net and 4 paddles included. Financing is $598/mo for 60 months with excellent credit. Pumping concrete past a pool, fencing between the court and the water and lighting choices can change the court quote. The pool is quoted separately from the court.
Estimated rates and terms are not binding and are subject to change. Your actual APR depends on credit score, amount financed and credit history; only borrowers with excellent credit qualify for the lowest rates. All financing is subject to credit review and approval by lending partners.
In many Mesa yards there is room for both if the layout is planned rather than improvised. A few patterns that work:
From Dobson Ranch in west Mesa to Eastmark in the southeast, yards and HOA rules vary, so every layout starts with a measured site walk.

Dink Pro Courts build in progress.
Planning landscape around the court too? Read planning a Mesa landscape with a court.
The pool team controls its own timeline; we fit the court around it. As a typical range, not a promise: we can usually be pouring concrete within a week, then the slab cures 21 to 28 days depending on weather before we paint.
When you compare swimming pool builders in Mesa, most quotes focus on the pool shell, finish, equipment and deck. If you also want a court, add these points to every conversation so the yard works as a whole.
We design and build your pool, landscape and court, so you have one contact for the whole Mesa backyard. Nearby, see our pool builder in Gilbert and pool builder in Queen Creek pages.
We do. The pool, its barrier and the court fence are planned together for your Mesa yard, so the inspection stages and the court work never collide.
Mesa’s pool code says every barrier has to be installed, inspected and approved before the pool is plastered or filled with water. We keep court fencing and gates out of the barrier line during that stage, so the inspection is about the pool alone.
It can. Mesa’s code treats a spa or hot tub holding water over 18 inches deep as a residential pool, so it needs a barrier or an approved safety cover. The pool team decides which; we place the court so it works with either.
We keep them as separate slabs with a planned edge between them, so water from the deck does not run across the court and each surface can move on its own. A walkway between the two works well.
Yes, with grading. SRP says homeowners have to keep irrigation water on their own property, so the flood basin, the pool deck and the court each need their own levels. The landscape team shapes the basin, the pool team sets the deck and we set the court height.
Possibly for a while. Mesa requires construction fencing around in-ground pool sites while they are being built. We plan the court pour for a stretch when access around that fencing is clear.
Away from the sidelines and the court gate, with room to service it. Pumps make noise and equipment needs access, so we mark the court area early and the pool team places the pad with that in mind.
Ask where the court would go on their pool plan, how the barrier fence and court fence meet, which access route the trucks use, and where the equipment pad sits. If the answers are vague, put the court on the drawing before you sign.
Tell us where the pool is planned or already sits, and send any pool sketch you already have. Prefer to talk? Call or text (480) 493-0031.
Send a pool sketch or a few photos. We will mark a court area, check access and show the pool team where the court sits.
Call or text (480) 493-0031 to check your yard and book your build.